Tuesday, May 17, 2011

Installing a New Bath Tub



Setting up a bath tub is not exactly brain surgery, however it does require solid plumbing, woodworking, and often, tiling abilities. Changing a classic bath tub with a brand new one is another moderately difficult project. When the old tub is instantly accessible, the project can move quickly if you need to open a wall to get rid of that old tub and squeeze new bath tub, the job is a lot harder. Either in situation, the project is at a house handyman's abilities, although you may need a assistant to re-locate that old tub and occur the brand new one. Make certain you've qualified yourself to do the job and therefore are comfortable trying it. Instead of employing a contractor to consider on the midway-completed project, it is best to think about employing one before beginning. Odds are you might need a professional plumber to create tube connections.

This information will assist you to use a new bath tub inside your bathroom for those who have already purchased a new tub and do not need to alter the arrangement of the previous water supply pipes.

Your tools and material record should comprise of:

Completely new Tub

Hammer

Pipe Wrenches

Prybar

Safety Glasses

Level

Pliers

Adjustable Wrench

Putty Knife

Screwdriver

Cold Chisel

Tape-measure

Pipe Caps

Planning for that Installation

First of all, the supporting frame provided using the bath ought to be fitted (if needed) based on the manufacturer’s instructions.

Next, fit the taps or mixer towards the bath tub. When fitting the tap block, you should make certain when the tap has a plastic washer, it's fitted between your bath and also the taps. On the plastic bath, it's also sensible to suit a supporting plate underneath the taps unit to avoid stress on the bath tub.

Fit the flexible tap fittings to the foot of both taps using 2 nuts (sometimes supplied with your bathtub).

Fit the plug-hole outlet by covering mastic filler around the sink outlet hole, after which pass the opening with the hole within the bath. Make use of the nut provided through the manufacturer to suit the plug-hole. Examine the plug-hole outlet to have an inlet quietly for that overflow pipe.

Next, fit the finish from the flexible overflow pipe towards the overflow outlet. Next, screw the pipe towards the overflow face that ought to be fitted within the bath. Make certain you utilize all the provided washing machines.

Connect the trap to the foot of the waste outlet about the bath tub by winding the thread from the waste outlet with silicone mastic or PTFE tape, and screw about the trap towards the outlet. Connect the foot of the overflow tube in the same way.

The tub should now anticipate to be built in its final position.

Getting rid of Old Taps

If you want to replace old taps with brand new ones as part of your installation, then your first factor you need to do is disconnect water supply. After doing this, switch on the taps to empty water residing in the machine. The entire process of getting rid of the present taps can be very problematic because of the restricted access that's frequently the situation.

Make use of a basin wrench (crowsfoot spanner) or perhaps a tap tool to undo the nut that connects the provision pipes towards the taps. Possess a cloth ready for that remaining water which will range from pipes. When the supply pipes happen to be removed, make use of the same tool to release the nut store the taps to the bath/basin. You will have to stop the only taps from turning throughout this method. When the taps happen to be removed, the holes within the bath/basin must be washed of any sealing compound.

Before moving onto fit the brand new taps, compare the pipe connections about the old taps towards the new taps. When the old taps are longer compared to new taps, a shank adapter is needed for that new taps to suit.


Setting up the Bath tub

While using two wooden boards under its ft, put the bath tub within the needed position. The wooden boards are useful in evenly distributing the load from the bath tub within the part of the boards rather than focusing all of the weight onto four small points.

The following goal is to make sure that the bath tub is equalized over-all. This is often accomplished by checking the spirit level and modifying the ft about the bath tub before spirit level reads level.

To set up taps, fit the foot of the farthest flexible tap connector towards the appropriate supply pipe by looking into making a compression join then do exactly the same for that other tap.

Turn on water supply and appearance all joints and new pipework for leaks and tighten them if required. Fill the bath tub as well as look into the overflow outlet and also the normal outlet for leaks.

Finally, fix the tub paneling as referred to within the manufacturer’s instructions.

Tiling and sealing round the bath tub should hold back until the bath tub has been utilized at least one time because this will settle it into its final position.

Fitting New Taps

When the tails from the new taps are plastic, then you may need a plastic connector to avoid harm to the thread. One finish from the connector fits about the plastic tail from the tap and also the other finish supplies a link with the existent supply pipes.

If you want to fit a monobloc, then you'll require reducing couplers, which connects the 10mm pipe from the monobloc towards the standard 15mm supply pipe.

Next, squeeze tap within the mounting hole within the bath/basin making certain the washing machines have been in place between your tap and also the sink. Secure the tap in position using the manufacturer provided backnut. When the tap is safely in position, the provision pipes could be attached to the tails from the taps. The taps may either link by utilizing corrugated copper piping or with normal tap fittings. The first kind type ought to be attached to the tap finishes first, tightening only manually. The provision pipes can later be attached to the other finish. Tighten both finishes having a spanner after both finishes happen to be connected.

Tiling Round the Bath tub

In the region in which the bath meets the tile, it's important to seal the joins having a silicone rubber caulking. This will be significant because the fitting can move enough to hack a rigid seal, leading to water to enter the wall between your bath and also the tiling, resulting in complications with dampness and possible leaks towards the ceiling below.

You can decide on a number of coloured sealants combine inside your fittings and fixtures. They're offered in tubes and tubes, and can handle sealing gaps up to and including width of 3mm (1/8 inch). For those who have a bigger gap to fill, you are able to grow it with twists of drenched newspaper or soft rope. Always fill the bath tub with water before sealing, to permit the movement experienced once the tub is being used. The sealant can crack fairly early if you don't consider this movement before sealing.

Alternatively, ceramic coving or quadrant tiles may be used to edge the tub or shower tray. Plastic strips of coving, which are simple to use and cut to size, will also be easily in the marketplace. You should fit the tiles using water-resistant or waterproof adhesive and grout.

Tips on Copper Repiping

Re-piping is really a procedure for changing the copper pipes inside a household or business. It's not a brief fix or perhaps a alternative of short parts of pipe, but an entire alternative of the supply plumbing system. You will find several reasons you may want to repipe your home or office. Corrosion of pipes could cause low water pressure, rusty colored water, reduced waterflow and drainage, or leaks. If you are planning to redesign it's a good time for you to repipe before you decide to fresh paint or finish your walls. You should view the scope from the project before jobs are began. If you see a remote leak or perhaps a small part of your existing piping seeping, or valves which are corroded or cracked, it is in most cases a sign of a bigger issue.



Repiping is really a procedure for setting up a brand new copper repipe system. This method usually includes getting rid of old readily accessible pipe after which setting up the brand new plumbing system. Incorporated along the way is installing new USA type "L" hard copper, correctly strapped and guaranteed, install kwik 1/4 turn ball type water stops, install new stainless water supply lines. Following the new piping product is installed water is switched back on, the machine is pressure examined after which disguarded. The repiping process takes 1-three days to set up the brand new piping system. Following the actual plumbing alternative, you will verify some needed wall patching.

An expert site inspection is crucial to some effective repiping process. Standard copper repiping projects include installing of brand new cold and hot domestic water piping in the water source to any or all existing taps and fittings. Unless of course particularly incorporated within the proposal, drain alternative and fittings aren't incorporated.

You will find various materials utilized in re-piping, in water supply re-piping a few of the materials are metal and possibly some plastic pipes. The metal pipes are gal steel or iron, brass, and copper. The plastic pipes are Poly Vinyl Chloride PVC, Swimming pool water Poly Vinyl Chloride CPVC, Poly Ethylene PE, Polybutylene PB, and Kitec. Many of these plastic pipe systems will finish in legal cases. Area of the issue is using the fixtures which are frequently inexpensively created using little qc with a verity of overseas companies. Plastic pipes also provide questionable joining techniques. Plastic pipes are glued, crimped, and banded. When plastic pipes blow some pot they blow apart and lead to water damage and mold. Plastics become brittle as we grow older and warmth. You will find also issues concerning the molecular structure of plastics and also the resins that they're made. In rare instances a CPVC repipe maybe suggested in which the water PH levels really are a problem.

A brand new trend in re-piping is sand flaming inside of worn thin pipe and also the painting within the worn pipe with epoxy fresh paint. Sometimes throughout the sandblasting the sandblasting will put on thin and blow with the wall of joints and pipes. A number of individuals thin spots leak immediately and often individuals leaks come days or days later. Seeping pipes which are epoxy-covered finish up requiring to become correctly re-piped by setting up a CDA copper re-pipe.